maximum time allowable from concrete batching plant to site

90 Minute Rule - Eng-Tips Engineering Forums

How is concrete mixed at a batching plant?

Learn More

What is the Allowed Time for the Concrete Discharge?

Dec 08, 2017 · There is always confusion on site about the required or the allowed time for the concrete discharge. Some say it is 60 minutes, 90 minutes, 120 minutes, etc.

Learn More

Maximum Allowable Time From Initial Batching to Placement ...

Maximum Allowable Time From Initial Batching to Placement By Concrete Construction Staff Question: I am involved with a large urban concrete project where concrete delivery is sometimes delayed by traffic congestion. The specification requires concrete placement within 90 minutes of batching at the plant.

Learn More

Concrete Discharge Time Requirements - ASCC

This time limita- tion is permitted to be waived by the purchaser if the concrete is of such slump or slump flow after the 1-1/2 h time limit has been reached that it can be placed, without the addition of water, to the batch. This waiver is seldom used because the reasons for allowing the waiver are not well understood.

Learn More

90 Minute Rule - Concrete Engineering general discussion ...

The question I was really asking was if concrete is first mixed at the site, why does the 90 minutes (US guideline) actually begin from the time of batching at the plant. This is a requirement in New York State DOT specifications.

Learn More

Time limit between placing fresh concrete layers

BS 8500-2 requires concrete to be delivered "within 2 h after the time of loading where transported in truck mixers or agitators or within 1 h after the time of loading where non-agitating equipment is used, unless a shorter time is specified or a longer time permitted by the specifier. These limits are sufficient for normal UK temperatures."

Learn More

Mixing and Transporting Concrete

As a general rule of thumb, thirty to sixty minutes of transportation are acceptable on small jobs. At a central or portable ready-mix plant, concrete should be discharged from a truck mixer or agitator truck within two hours. If non-agitating transporting equipment is used, this time is reduced to one hour.

Learn More

How Long Can a Ready-mix Truck Wait?| Concrete Construction ...

Oct 27, 2010 · ASTM C-94, Specification for Ready-Mixed Concrete, does place a time requirement on delivered concrete. The document states that discharge of the concrete shall be completed within 1 ½ hours after the introduction of the mixing water to the cement and aggregates, or the introduction of the cement to the aggregates.

Learn More

How to build a concrete batching plant

2 days ago · When purchasing a concrete batching plant, the theoretical productivity of the concrete plant ought to be larger than we need. For example, if projects’ required amount of concrete is 70 cubic meters per hour, then we should choose hzs90 concrete plant with a theoretical productivity of 90m³/h, instead of hzs75 concrete plant with 75m³/h.

Learn More

2 hour transit time - Concrete Engineering general discussion ...

In the summer, that can be exceeded in under 90 min. necesitating proceedures such as using ice. Assuming the plant is a reputable plant, you will get your best quality concrete by batching the concrete at the plant and placinging it before it gets too hot. The truck should be able to dump in 10 min. if it is being pumped.

Learn More

EFFECT OF TRANSIT TIME ON READY MIX CONCRETE

When the transit time of ready mix concrete is high, the initial setting of concrete may take place. To avoid setting of concrete, retarding admixtures can be used to prolong the setting of concrete. While permitting use of retarder, it should be ensured that the suitability and dose of retarder is decided after conducting necessary trials.

Learn More

Batching, Mixing, Transporting, and Handling Concrete

When truck mixers are used, ASTM C94 (AASHTO M 157) also limits the time between batching and complete discharge of the concrete at the job site to 1½ hours. ASTM C94 (AASHTO M 157) also limits the number of drum revolutions to 300 times after introduction of water to the cement and aggregates, or the cement to the aggregates.

Learn More

Work Plan and Trial Batching Precast Concrete

how QC will monitor the batch plant and hauling equipment operations including the target weights, aggregate moisture content, batch weight tolerances, concrete temperature limits, and accelerated curing requirements (when applicable). 4.2.10 Concrete Admixtures—Adjust admixtures within the allowable limits below. Obtain

Learn More

Maximum temperature limits for hot-weather concreting

Others say a temperature higher than 90 ºF (32 ºC) is allowable if the concrete contains a set-retarding admixture. A. ACI 301-16 “Specifications for Structural Concrete” and ACI 305.1-14 “Specification for Hot Weather Concreting” limit the maximum concrete temperature to 95 °F (35 ºC) at the time of discharge. This limit is for ...

Learn More

BATCHING AND MIXING

September 1, 2003 CONCRETE MANUAL 5-694.400 BATCHING AND MIXING 5-694.400 5-694.401 CHECKING BATC H PLANT OPERATION Check to ensure accuracy and dependable operati on of the proposed equipment and methods prior to the start of concreting operations and after ma king any changes in the location or arrangement of the batching plant.

Learn More

Ready Mix Concrete Batching, Mixing, Transporting, and Handling

Fig. 1. Control room for batching equipment in a typical ready mixed concrete plant. Stationary Mixing of Concrete. Stationary Mixers are used onsite or Central Mix R/M plant. It is used for complete or shrink mixing. The concrete mixer can mix up to 9m 3. It can have tilting or non-tilting drum, open top revolving blade or paddle.

Learn More

Water-to-Cement Ratio and Aggregate Moisture Corrections

May 28, 2010 · – Amount of free water in the concrete – Time since batching at the time of testing. Slump is usually indicated in the job specifications as a range or as a maximum value not to be exceeded. If slump is not specified, ACI 211.1 Table 6.3.1 has established recommended slumps based on the various types of construction.”

Learn More

Full text of "IS 4925: Concrete Batching and Mixing Plant"

Full text of "IS 4925: Concrete Batching and Mixing Plant" See other formats ***** -k t^^ Disclosure to Promote the Right To Information Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information under the control of public authorities, in order to promote transparency and accountability in the working of every ...

Learn More

How does the mixer batch size affect the production capacity ...

The maximum hourly production capacity of a mixer is calculated by multiplying the maximum batch capacity of the mixer by the number of mixing cycles per hour. The duration of a mixing cycle is calculated by summing up the filling time [s], the mixing time [s] and the discharge time [s].

Learn More

Slump adjustment is a fact of life for concrete contractors ...

Batching tolerances. Even with sophisticated computer- c o n t ro l l e d batch plants, batching tolera n c e s can affect slump control. To l e r - ances for the individual batching of each mix ingredient are given be-l o w (Ref. 1). Examples of how each t o l e r ance affects the batch we i g h t s of a typical 3500-psi concrete mix also are ...

Learn More

Chapter 4: Construction Details, Section 90: Concrete

Concrete subject to these exposure areas will be designated in the contract. 4-9001A (2a) 2 Water Content. Section 90-1.02G(6), “Quantity of Water and Penetration or Slump,” of the Standard Specifications provides the general requirements for maximum free water allowed in concrete mix designs. There may be specific provisions concerning ...

Learn More

Ready-mix concrete - Wikipedia

Advantages and disadvantages of ready-mix concrete. Materials are combined in a batch plant, and the hydration process begins at the moment water meets the cement, so the travel time from the plant to the site, and the time before the concrete is placed on site, is critical over longer distances.

Learn More

GENERAL AIR QUALITY CONTROL PERMIT for Concrete Batch Plants

This document is a General Permit for portable and stationary Plants, Concrete Batch authorized under Arizona Administrative Code (A.A.C.) R182-501 through 511 and - Arizona Revised Statutes (A.R.S.) §49426. Owners/operators of existing and new - concrete b atch plants may obtain coverage under this general permit in lieu of an individual permit.

Learn More

A Contractor’s Guide to Superplasticizers

Plant or Site Addition One admixture manufacture r states that if haul times are part i c - ularly long, a Type G HRWR added at the plant can minimize pro b - lems associated with ASTM C 94’s limitations on delive r y time and mixer re vo l u t i o n s. The re t a r der in a Type G will also delay the set for that long run. If unexpected delays

Learn More

304R-00 Guide for Measuring, Mixing, Transporting, and ...

achieving maximum uniformity, homogeneity, and quality of concrete in place, figures that illustrate good and poor practices are also included in this guide. 1.3— Other considerations All who are involved with concrete work should know the importance of maintaining the unit water content as low as possible and still consistent with placing ...